Friday, December 19, 2008

Plastering - Work in Progress Part 1

Living Room - View from walkway


Dining Area


Dining Area - View from walkway


Dining Area - Curtain pelmet not built yet


Kitchen - Wall of fridge and stove


Kitchen - Need to box this up


Spare Room - Slight shifting of door frame to accomodate air con trunking.


Spare Room - Building the niche (wall behind living room tv console)


Walkway


Common Toilet - From outside


Common Toilet - Inside


Master Bedroom (extension - wardrobe area)


Master Bedroom (Extension - Curtain Pelmet)


Master Bedroom


Master Bedroom (Curtain Pelmet)


Master Toilet - Half finished. Niche at shower area not up yet.

Sunday, December 14, 2008

New Expressway Exit (PIE) to our house!

Furnishings and Appliances



Work Schedule - Due completion 8th Jan 09!!

Air con trunking installation

Living Room - Air Con above kitchen door. To conceal trunking by lowering door frame.


Kitchen - Trunking close up. To be boxed up.


Kitchen - Trunking to spare room.


Walkway - Location of Air Con for Dining Room


Walkway - Air Con trunking leading spare room. To hide trunking by shifting the bedroom door and concealing in door frame.


Spare room - Trunking from Dining Room Air Con mounted above walkway to rooms (top right). Trunking from Living Room Air Con mounted above kitchen door (top left). Wall to be concealed with boxed up niche.

Both trunkings merge and lead out to A/C Compressor (bottom).


Spare Room - Trunking leading to the A/C Compressor ledge (bottom).


Spare Room - Location of Air con.


Common Toilet - MBR Air Con trunking going through here to A/C Compressor ledge. To be painted over.


Common Toilet - Air Con Trunking (gas). To be boxed up and concealed.


MBR - Air Con to be mounted at top left corner of picture. Trunking to be painted over.


MBR - Trunking hidden behind feature wall. Slanted casing is for water and the horizontal one is for Air Con Gas


Master Toilet - Entry of Gas Pipes from MBR (to be painted)


Master Toilet - Entry of water pipe from MBR


Master Toilet - Grey water pipe from MBR Aircon to sewage trap (to be concealed by tiling up)

Plumbing Works Part 1

Service Balcony








Kitchen


Common Toilet


Master Toilet



Tiling Works .. till 29 Nov Part 2

Main Door


Skirting's done


Shifing of Kitchen Door


Fridge Base


Washing Machine Base in Service Balcony


Common Toilet


Master Toilet


Master Toilet